Thread
:
Thameslink North South connections
View Single Post
#
60
August 1st 11, 08:47 PM posted to uk.transport.london
[email protected]
external usenet poster
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Thameslink North South connections
In article ,
(Roland Perry)
wrote:
In message , at 16:54:29 on
Mon, 1 Aug 2011, Paul Scott remarked:
What they said:
5.13.6 Following the completion of the Thameslink
Programme the following morning peak train service
(14 trains per hour) is anticipated as remaining in
operation into London King's Cross:
Cambridge stopping services, via WGC
- two x eight-car trains operated by Class 377
stock (maximum acceleration is particularly
important on this service group, given the
need for calls at Welwyn North)
Peterborough fast services
- two x 12-car trains operated by Class 365 stock
[The other 10 services are 2 x Kings Lynn IEP and 8 x long distance.]
So what, if any, Cambridge peak trains will go to Horsham?
The two mentioned in the OP that are going through to Horsham via the
yet to open ECML link to St Pancras LL. Those above are going to Kings
Cross - ie the mainline station. What's so difficult about all this?
At the moment, peak trains to Cambridge are much more like the normal
timetable, but longer and with a few extra stops. What you seem to be
describing are a couple of extra trains on a different route (from KX
not Horsham).
It's not "difficult", but it's taking a while to tease out the full
picture.
Meanwhile Colin doesn't think that one of the two 12car Horsham
trains off-peak will stop at the Cambridge rural stations (which
something must), nor indeed could does he think they could be
described as "semi-fast".
The semi-fast description isn't just related to stops at stations between
Royston and Cambridge. It also relates to a larger number of stops between
Stevenage and Hatfield plus Potters Bar.
--
Colin Rosenstiel
Reply With Quote
[email protected]
View Public Profile
Find all posts by
[email protected]