View Single Post
  #2   Report Post  
Old October 15th 11, 03:42 PM posted to uk.transport.london,uk.railway
Don Davis Don Davis is offline
external usenet poster
 
First recorded activity at LondonBanter: Oct 2011
Posts: 1
Default Baker St.(Met) and Met operations


wrote in message
...
Do the platforms at Baker St. which are used by Met trains heading to/
from Aldgate ever get used for trains which terminate at Baker St.?
Are all the Met platforms at Baker St. used fairly intensively or is
there capacity for a train to be stabled out of use when defective or
as a stand-by?
Do trains stick to Aldgate or "non-Aldgate" services for most of the
day or do they interwork between the two?
What determines which diagrams will be allocated "A Stock" and which
"S Stock"?
Does the Chesham branch work better as a "through" service or should
it have been left as a shuttle?

--
gordon

When the Aldgate service was peak hours only in T stock days the through
platforms were certainly used for the off peak terrminators.The station
could not have coped otherwise.
Don Davis