View Single Post
  #13   Report Post  
Old October 15th 11, 08:50 PM posted to uk.transport.london,uk.railway
Peter Masson[_2_] Peter Masson[_2_] is offline
external usenet poster
 
First recorded activity at LondonBanter: Apr 2009
Posts: 367
Default Baker St.(Met) and Met operations



wrote

True. I just wondered whether there had been any perceived diminution
of reliability by Cheshamites used to a self-contained yo-yo-like
operation not subject to the potential for delay which would be more
prone to afflict the odd "through" journey and where the frequency is
low enough to make reference to a timetable a more likely thing than
many other parts of the LU network.


I suspect that delays on through trains now have to be balanced against
times when connections were broken at Chalfont to/from the shuttle.

Peter