View Single Post
  #2   Report Post  
Old October 18th 11, 08:22 PM posted to uk.transport.london
Richard J.[_3_] Richard J.[_3_] is offline
external usenet poster
 
First recorded activity at LondonBanter: Mar 2009
Posts: 664
Default Overrun of engineering work on the Wimbledon Branch

Zen83237 wrote on 18 October 2011 18:56:07 ...
I understand that there a 12 hour overrun on engineering work on the
Wimbledon branch recently. Can any body tell me what happened?


I can't explain what happened, but I noticed a poster at Turnham Green
on the evening of Tuesday 11 October containing an apology by Balfour
Beatty for disruption on the Wimbledon branch that morning. An
engineering overrun was my first thought. But a 12-hour overrun seems
unlikely, as that would imply services not restored until around 17:00,
which was roughly when I saw the poster. But it must have been bad to
have the poster printed. The Evening Standard that evening reported
District Line disruption but gave no details.
--
Richard J.
(to email me, swap 'uk' and 'yon' in address)