View Single Post
  #24   Report Post  
Old November 20th 11, 10:30 AM posted to uk.transport.london
Basil Jet[_2_] Basil Jet[_2_] is offline
external usenet poster
 
First recorded activity at LondonBanter: Apr 2010
Posts: 547
Default Boost for Tube extension plan as Wandsworth gets triple-A ratings

On 2011\11\20 10:53, Paul Terry wrote:

I know the Kennington loop only connects with the west end side of the
northern line because back in the 60s and 70s I worked on it, will it
stay in service?


Almost certainly, as the proposed terminus of the extension at Battersea
is only two-track, which would not be sufficient for turning back the
full peak-time service of the CX branch.


Why not? Surely more trains are turned in the two-track terminus at Brixton.