View Single Post
  #11   Report Post  
Old February 18th 04, 08:42 AM posted to uk.transport.london
Boltar Boltar is offline
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,346
Default Aldwych : Proposals in the 60s

"jmu2000" security novels @ free uk.com wrote in message ...
"Colin" wrote in message
...

On a related theme , does anyone know how far the running tunnels

extend
south
of aldwych? Do they reach the river?

B2003


No they don't. They go less than 10 metres past the end of the platform,
which means they must be at least 100metres from the Thames Embankment.

On a slightly different tangent however, the overrun tunnels east of Charing
Cross on the Jubilee Line do almost reach Aldwych, indicating one
possibility that was considered at one time. I don't know whether the track
runs the entire length though, or what lurks at the very end (parts of the
TBM I expect).


I've often wondered if trains ever run down these long overrun tunnels around
the system just to test the track and make sure everything works. Does anyone
at all ever go down them, inspection teams or the like?

B2003