Complete (almost) Shutdown of Berlin Train System - could ithappen here...??
Am 01.01.2012 23:28, schrieb Hans-Joachim Zierke:
Failures in 2009/2010 were caused by
design error by the manufacturer, miscalculating wheel strength.
under the pressure of their customer, DB AG, to make the S-Bahn
trains cheaper.
Same issue as with the wheel crises of DB's ICE trains.
And still a result of the separation of the design and construction
of the rolling stock from the operator.
L.W.
|