View Single Post
  #21   Report Post  
Old June 14th 12, 09:19 AM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
Paul Scott[_3_] Paul Scott[_3_] is offline
external usenet poster
 
First recorded activity at LondonBanter: Sep 2010
Posts: 460
Default Paddington Station H&C Platforms

"77002" wrote in message
...
On Jun 14, 9:38 am, "Paul Scott"
wrote:
That's correct. Links to the planning drawings have been posted in
previous
threads over the last few years but you may have missed them. There will
be
no paid side access between the H&C and National Rail platforms.

IMHO the Bridge could usefully stretch all the way to Platform one
giving access to all mainline platforms.


The CP5 enhancement plans for PAD include a further development of the
west
end footbridges, although detail is a bit sketchy.

It is an awful long walk from Praed Street to the Canal Side. I am
not even sure of the way. If one wants to travel clockwise on the
Circle the District and Circle Line platforms are not real helpful.
One can only reach Edgware Road without changing trains.


CJBs did not provide a full or correct description though. He is grinding a
personal axe about Paddington, as usual.

The canal side entrance is not the only entrance to the new H&C station,
there is also an entrance from the station side (it's effectively in line
with the taxi waiting area, and is also accessible from the 'land side'
footbridge at the end of the train shed).

Passengers between the station and the H&C will NOT need to go via the canal
side entrance...

Paul S