View Single Post
  #8   Report Post  
Old October 24th 12, 07:02 PM posted to uk.railway,uk.transport.london,misc.transport.urban-transit
Charles Ellson[_2_] Charles Ellson[_2_] is offline
external usenet poster
 
First recorded activity at LondonBanter: Sep 2012
Posts: 498
Default Amersham and Chesham

On Wed, 24 Oct 2012 09:31:37 -0700 (PDT), D7666
wrote:

On Oct 24, 11:57*am, 77002 wrote:

It really IS time to hand the fast pair over to NR/Chiltern and cut
TfL back to Moor Park and Watford.- Hide quoted text -


To acheive what ?

Vary it to future upgrading in the form of 25kV from Marylebone to
Aylesbury with DC left until further notice between Harrow and
Amersham. This leaves roughly the same track availability as at
present with the opportunity for future (whole/part) conversion of the
Met to 25kV when the DC equipment is beyond saving, possible use of
joint stock (i.e. including existing stock with new transformer
coaches and new sets re-using displaced coaches from old sets). With
the Met being diverted to Watford Junction and thoughts about
extensions north of Aylesbury it would reduce the electrical
incompatibility that LU has with surrounding systems.