Ultimate signaling balls up at London Bridge
On 18/11/2012 14:19, Phil Cook wrote:
On 18/11/2012 13:55, Graeme Wall wrote:
On 18/11/2012 13:51, ian batten wrote:
On Nov 18, 9:29 am, Graeme wrote:
On 18/11/2012 00:01, djxc6 wrote:
Edit. Opening paragraph should be arriving at LB at 19:30 and catching
19:45 FCC service, not an hour later!
Further edit, it is "should HAVE" *not* "should OF"
Signalling has two ls.
Quintishill was a more substantial signalling balls up.
And has an "n" :-)
Two...
Doh!
--
Graeme Wall
This account not read, substitute trains for rail.
Railway Miscellany at http://www.greywall.demon.co.uk/rail
|