Aldwych / Strand London Underground
77002 wrote:
On 4 Dec, 12:18, wrote:
Crossrail should have gone with double decker trains. The bullet should just
have been bitten and regauge all the pre-existing lines it'll run on to
UIC gauge. It would cost a lot in the short term but the long term gains would
almost certainly make it worth it.
That would probably have lengthened load/unloading times.
Not if they have double decker platforms too.
|