Aldwych / Strand London Underground
On 06/12/2012 11:51, Graham Murray wrote:
writes:
On 4 Dec, 12:18, wrote:
Crossrail should have gone with double decker trains. The bullet should just
have been bitten and regauge all the pre-existing lines it'll run on to
UIC gauge. It would cost a lot in the short term but the long term gains would
almost certainly make it worth it.
That would probably have lengthened load/unloading times.
What are the relative loading/unloading times for Paris double-deck vs
single-deck RER services?
Don't know about Paris but dwell times for Dutch DD stock are noticeably
longer than for the conventional metro stock on the next platform.
--
Graeme Wall
This account not read, substitute trains for rail.
Railway Miscellany at http://www.greywall.demon.co.uk/rail
|