View Single Post
  #26   Report Post  
Old December 6th 12, 08:39 PM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
Tim Roll-Pickering Tim Roll-Pickering is offline
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 739
Default London Battersea Northern Line extension now done with a loan?

d wrote:

Fast forward to the Jubilee Line extension: This one was much less
well planned, but did manage provide a useful route with some


Useful until it heads of to stratford pointlessly duplicating the DLR.


It provides a direct link from east to south London, starting from east
London's biggest non-interchange station. It provides much needed pressure
relief for the DLR. It regularly fills up before it first hits the Thames.
How is that not useful?

--
My blog:
http://adf.ly/4hi4c