View Single Post
  #42   Report Post  
Old December 8th 12, 01:36 PM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
D A Stocks[_2_] D A Stocks[_2_] is offline
external usenet poster
 
First recorded activity at LondonBanter: May 2011
Posts: 154
Default London Battersea Northern Line extension now done with a loan?

"77002" wrote in message
...
On 5 Dec, 16:39, wrote:

If the line is intended to replace the two existing Battersea stations
(accelerating services into Victoria and Waterloo), and would then
continue to Clapham Junction (for interchange with the mainlines) it
might make some sort of sense.


Of one thing we can be very confident: Clapham Junction will *never* have an
interchange with a tube line. Just imagine the cost.

D A Stocks