Jack Taylor wrote:
"Colin Rosenstiel" wrote in message
...
The GN of WAGN will have a connection to Thameslink from 2007.
A physical connection, that is.
Yes... so will they actually be able to run trains across it or would
that require TL2K's signalling upgrade?
--
Dave Arquati
Imperial College, SW7
www.alwaystouchout.com - Transport projects in London