View Single Post
  #46   Report Post  
Old April 6th 04, 11:30 PM posted to uk.transport.london
Colin Rosenstiel Colin Rosenstiel is offline
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 2,146
Default New rail operator "One"

In article , (Roland
Perry) wrote:

In message , Dave Arquati
writes
to go anywhere useful beyond St Pancras
Surely that will also require the rebuilding at Blackfriars and
London Bridge. Are either of those expected to be done by 2007?


I think that's what he meant...


He was commenting on a signalling upgrade, actually.


My current understanding is that the signalling to reach even St Pancras
Midland Road is uncertain. Such is the shambles sometimes described as our
railways. :-((

--
Colin Rosenstiel