Thread
:
New rail operator "One"
View Single Post
#
53
April 7th 04, 06:21 PM posted to uk.transport.london
Dave Arquati
external usenet poster
First recorded activity at LondonBanter: Jul 2003
Posts: 1,158
Connecting GN to TL (was New rail operator "One")
Colin Rosenstiel wrote:
In article ,
(Roland
Perry) wrote:
In message , Dave Arquati
writes
to go anywhere useful beyond St Pancras
Surely that will also require the rebuilding at Blackfriars and
London Bridge. Are either of those expected to be done by 2007?
I think that's what he meant...
He was commenting on a signalling upgrade, actually.
My current understanding is that the signalling to reach even St Pancras
Midland Road is uncertain. Such is the shambles sometimes described as our
railways. :-((
"This train is for King's Cross Railway Lands. Change for onward foot
connections to St Pancras Midland Road."
--
Dave Arquati
Imperial College, SW7
www.alwaystouchout.com
- Transport projects in London
Reply With Quote
Dave Arquati
View Public Profile
Find all posts by Dave Arquati