Paul Corfield wrote:

I'm surprised no-one commented on the Goblin electrification and WA news
in
this and my previous piston the same topic.


I'm surprised the Goblin electrification comes in at only £90 million.
If it can be done so cheaply, why wasn't it done sooner?


TfL have been arguing it can be done for far *less* than £90m. Network
Rail are doing detailed surveys and costings to try to get a firm
estimate and achieveable methodology for doing the work. TfL have also
suggested that any "compensation payments" that would to go LOROL when
the line is closed for improvements could be waived to get the costs
down.


I am delighted we have got the go ahead - the extra capacity is
urgently needed. The only worry is that work will probably not start
until 2015/16 (a guess on my part btw).


This leaves the issues of no through platforms at Gospel Oak and the
platform length at South Tottenham - have there been any feasibility studies
on either of these?

--