View Single Post
  #11   Report Post  
Old June 27th 13, 11:36 PM posted to uk.transport.london
Recliner[_2_] Recliner[_2_] is offline
external usenet poster
 
First recorded activity at LondonBanter: Dec 2008
Posts: 2,008
Default 8.5% cut in central govt grant to TfL; suburban West Anglia trainsto be de

wrote:
In article ,
(Tim Roll-Pickering) wrote:

Paul Corfield wrote:

I'm surprised no-one commented on the Goblin electrification and WA
news in this and my previous piston the same topic.


[snip]

I am delighted we have got the go ahead - the extra capacity is
urgently needed. The only worry is that work will probably not start
until 2015/16 (a guess on my part btw).


This leaves the issues of no through platforms at Gospel Oak and the
platform length at South Tottenham - have there been any feasibility
studies on either of these?


Are they planning to run west of Gospel Oak anyway?


Once they have a common fleet, it's at least a possibility, so worth
considering. Lots of passengers interchange at Gospel Oak, so they'd
presumably welcome through trains (particularly those heading west -- it's
a lot of stairs down and up).