On 2013\09\05 19:01, Paul Corfield wrote:
On Thu, 05 Sep 2013 17:41:25 +0100, Basil Jet
wrote:

On 2013\09\05 15:49, Graham Murray wrote:
Paul Corfield writes:

A shame they didn't bother to explain what Base, Enhanced and Optimal
actually means

The actual usage, according to the map, of 'Optimal' and 'Enhanced'
seems to me to be contra-intuitive.


I imagine they refer to the level of funding which is still to be
determined: if they receive base funding they do the base lot, enhanced
funding they do the enhanced lot too and optimal funding will allow them
to do the lot.


I thought the Chancellor had doled out £45m to do the entire South
East


Maybe it's an old map.