Thread
:
Croxley rail link additioanl funding.
View Single Post
#
19
July 12th 14, 11:18 AM posted to uk.transport.london
[email protected]
external usenet poster
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Croxley rail link additioanl funding.
In article ,
(Roland Perry)
wrote:
In message
,
at 15:53:32 on Fri, 11 Jul 2014, Recliner
remarked:
The Lea Bridge station is a reopening, using the existing platforms. A
better comparison might be the all-new station at Southend Airport, which
cost £16m in 2011.
East Midlands Airport station cost £25m and Cambridge Northstowe
Parkway (officially called "Science Park") is going to cost £26m.
Common features are that each have one platform plus one island,
large car parks and new access roads, and are built on out-of-town
brown field sites. The costs are therefore consistent with Southend
Airport.
Does Southend Airport station have a bay platform? I thought it was just
platforms constructed alongside existing tracks, with no track alterations
required?
--
Colin Rosenstiel
Reply With Quote
[email protected]
View Public Profile
Find all posts by
[email protected]