View Single Post
  #31   Report Post  
Old July 14th 14, 02:34 PM posted to uk.transport.london
[email protected] rosenstiel@cix.compulink.co.uk is offline
external usenet poster
 
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Default Croxley rail link additioanl funding.

In article , (Roland Perry)
wrote:

In message , at
11:33:32 on Mon, 14 Jul 2014, David Cantrell
remarked:
A certain amount of the track work and signalling already exists for
Cambridge Science Park's bay platform, perhaps surprisingly. They are
left overs of the former St Ives branch, including what will become the
starting signal(!).


I would be shocked if any of it was still usable barring the odd bit of
conduit here and there. The last train ran over 20 years ago according
to t'interweb.


You are probably looking at the records for the line to St Ives. The
new station is being built on the old Chesterton Sidings, which
continues to have aggregates traffic to the Lafarges site.


Neither. The St Ives exit signal has been maintained and remains on the
Cambridge panel. I've seen it with my own eyes.

--
Colin Rosenstiel