Thread
:
5 car Overground trains to Watford Junction
View Single Post
#
37
January 13th 15, 02:02 PM posted to uk.transport.london
Roland Perry
external usenet poster
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
5 car Overground trains to Watford Junction
In message , at 14:36:50 on Tue, 13 Jan
2015,
d remarked:
It was said that enlarging the connaught tunnel for crossrail was "impossible"
but they managed it.
Only by a complete change of plan and draining the dock to
re-cut-and-cover, rather than widening from the inside.
Doesn't matter - they did it. Given how long the ELL was closed for to convert
it they had plenty of time
The critical timing was how long they could close the dock for, as it's
on the route between the river and ExCel, which has an annual boat show.
There was a documentary about the project in the Autumn, and they
finished it by the skin of their teeth.
--
Roland Perry
Reply With Quote
Roland Perry
View Public Profile
Find all posts by Roland Perry