Thread
:
5 car Overground trains to Watford Junction
View Single Post
#
42
January 13th 15, 08:07 PM posted to uk.transport.london
[email protected]
external usenet poster
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
5 car Overground trains to Watford Junction
In article ,
(Basil Jet)
wrote:
On 2015\01\13 16:40,
wrote:
It was singled to get it electrified through the tunnel which would
otherwise have been problematic.
Although I now wonder if it would be possible to triple the Canonbury
Curve, with the outer two third-rail-electrified tracks overlapping
with the central overhead-electrified one.
There's no third rail electrification near to the curve now. The only third
rail lines anywhere near are the East London Line pair of tracks with no
physical connection to the North London Line except the so far never
commissioned "stock transfer" connection some way to the west, at the end of
platform 2 at Highbury and Islington. I suspect connection will never be
commissioned now. They can use the connection at Clapham Junction far more
easily. The East London extension to Highbury was planned before the South
London Line takeover was planned.
--
Colin Rosenstiel
Reply With Quote
[email protected]
View Public Profile
Find all posts by
[email protected]