View Single Post
  #16   Report Post  
Old June 4th 15, 03:14 PM posted to uk.transport.london
Basil Jet[_4_] Basil Jet[_4_] is offline
external usenet poster
 
First recorded activity at LondonBanter: Sep 2014
Posts: 1,385
Default Crossrail tunneling complete

On 2015\06\04 15:58, Mizter T wrote:

On 04/06/2015 09:43, Jim Chisholm wrote:
So reports BBC:
http://www.bbc.co.uk/news/uk-england-london-33002819

"Tunnelling work in London has been completed in the £14.8bn Crossrail
scheme.
Eight boring machines have been cutting their way through earth to
create 26 miles (42km) of tunnels."



AFAIAA, there haven't been any tunnelling mishaps, which is perhaps
worthy of note and acclaim.


What would a "tunnelling mishap" be? I remember the NATM problem at
Heathrow, but that was surely a rare incident.