In message ,
Piatkow writes
Not that it needs the signalling, rather the signalling engineers need
night time shutdowns to put it in.
Overnight services are only being introduced on lines with no major
engineering projects in the pipeline.
Pity the Central Line finishes at Loughton. One more stop to Debden
(where some trains actually terminate ATM) would have got me home.
--
Bryan Morris
Public Key
http://www.pgp.uk.demon.net - 0xCC6237E9