View Single Post
  #11   Report Post  
Old October 1st 15, 06:59 PM posted to uk.transport.london
[email protected] rosenstiel@cix.compulink.co.uk is offline
external usenet poster
 
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Default Goblin electrification

In article , (Basil Jet)
wrote:

On 2015\10\01 09:55, Mike Bristow wrote:
In article

-september.
org, Recliner wrote:
[the goblin]
Are the platforms already long enough for four-car trains?


No. Most stations that used to have longer platforms have had the
length beyond two car closed. This would be easy to fix - repoint
the brickwork, repaint all the things, etc. But South Tottenham
would be more challenging - extending westwards is tricky becuase
there's a bridge over the A10 that way; extending eastwards is
tricky becuae there's a junction that way. Google maps will give
you a picture - literally.


Google maps suggests that you could easily double the length of the
platforms without running into the junction or the A10.


Indeed. I wonder why this has always been thought to be too difficult?

--
Colin Rosenstiel