View Single Post
  #43   Report Post  
Old November 15th 15, 01:01 AM posted to uk.transport.london,uk.railway
Ken Ward[_4_] Ken Ward[_4_] is offline
external usenet poster
 
First recorded activity at LondonBanter: Jun 2015
Posts: 6
Default Inclined lift at Greenford Station replaces the last woodenescalator

On 14/11/2015 09:03, Chris J Dixon wrote:
Basil Jet wrote:

https://www.youtube.com/watch?v=sxScXvX1Dv4


I'm a little surprised that they claim it uses less power than a
conventional lift. If you have to raise a given mass through a
given vertical distance, shouldn't the answer be the same?



Some form of energy recovery on down cycle maybe?