View Single Post
  #84   Report Post  
Old January 14th 16, 02:06 PM posted to uk.railway,misc.transport.uban-transit,uk.transport.london
Recliner[_3_] Recliner[_3_] is offline
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default By London's Northern Line to Battersea

e27002 aurora wrote:
On Thu, 14 Jan 2016 13:44:18 +0000, Basil Jet
wrote:

On 2016\01\14 13:17, Recliner wrote:
On Thu, 14 Jan 2016 13:08:41 +0000, e27002 aurora
wrote:

On Thu, 14 Jan 2016 00:14:35 +0000, Steve Fitzgerald
] wrote:

In message
,
Anna Noyd-Dryver writes

Hammersmith is no longer a depot as such. It's just a stabling point.

We have to take trains from Ealing Common to Edgware Road for H&C
services now.


Thanks Steve, I've been meaning to come back to this post - apparently only
6 S7s stable at Hammersmith overnight now.

Really? I didn't realise it was that few now as the other stabling
points haven't changed much.

Last time I was at HMD (for training) there were quite a few trains
about and space for, I would guess maybe 20 to 25 in total.

HMD was very much a C stock depot and once they went everything was
focused at Ealing Common and Upminster (and a couple at Neasden) which
both now provide H&C trains for service.

So, Anna's point seems to have more, and more merit. Unfortunately it
is too late now. The 14tph will remain as terminators.

But at OOC when it opens, which will be more useful than Paddington.


Yeah, but will OOC need 24tph? Would 12 not have been enough, with the
other twelve (or fewer) going to Hammersmith?


At one point there was talk of sending some Crossrail trains to Tring.
That seems to have been quietly set aside. IMHO Sending some
Crossrail trains to Tring and returning the Bakerloo to Watford would
be excellent. Euston's main emphasis should be on InterCity travel.


The Tring proposal seems to have receded because the Euston rebuilding for
HS2 is now planned to be in phases, so platforms for the Tring services
will remain available throughout. No-one is prepared to fund it given that
the need has faded.

With the Met headed for Watford Junction with a 6 tph service, there would
be neither the space not the need for the Bakerloo to return there.

OOC will be an important both as an interchange (with HS2 and LO) and as a
destination in its own so it's not a bad idea for Crossrail to terminate
many of its trains there. Also, if Heathrow Express fades away once
Crossrail opens, it might take over the HEx services to the airport,
meaning that 8 tph Crossrail could be headed there.