View Single Post
  #91   Report Post  
Old January 14th 16, 03:22 PM posted to uk.railway,misc.transport.uban-transit,uk.transport.london
Recliner[_3_] Recliner[_3_] is offline
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default By London's Northern Line to Battersea

Charles Ellson wrote:
On Thu, 14 Jan 2016 15:06:13 -0000 (UTC), Recliner
wrote:

e27002 aurora wrote:
On Thu, 14 Jan 2016 13:44:18 +0000, Basil Jet
wrote:

On 2016\01\14 13:17, Recliner wrote:
On Thu, 14 Jan 2016 13:08:41 +0000, e27002 aurora
wrote:

On Thu, 14 Jan 2016 00:14:35 +0000, Steve Fitzgerald
] wrote:

In message
,
Anna Noyd-Dryver writes

Hammersmith is no longer a depot as such. It's just a stabling point.

We have to take trains from Ealing Common to Edgware Road for H&C
services now.


Thanks Steve, I've been meaning to come back to this post - apparently only
6 S7s stable at Hammersmith overnight now.

Really? I didn't realise it was that few now as the other stabling
points haven't changed much.

Last time I was at HMD (for training) there were quite a few trains
about and space for, I would guess maybe 20 to 25 in total.

HMD was very much a C stock depot and once they went everything was
focused at Ealing Common and Upminster (and a couple at Neasden) which
both now provide H&C trains for service.

So, Anna's point seems to have more, and more merit. Unfortunately it
is too late now. The 14tph will remain as terminators.

But at OOC when it opens, which will be more useful than Paddington.

Yeah, but will OOC need 24tph? Would 12 not have been enough, with the
other twelve (or fewer) going to Hammersmith?

At one point there was talk of sending some Crossrail trains to Tring.
That seems to have been quietly set aside. IMHO Sending some
Crossrail trains to Tring and returning the Bakerloo to Watford would
be excellent. Euston's main emphasis should be on InterCity travel.


The Tring proposal seems to have receded because the Euston rebuilding for
HS2 is now planned to be in phases, so platforms for the Tring services
will remain available throughout. No-one is prepared to fund it given that
the need has faded.

With the Met headed for Watford Junction with a 6 tph service, there would
be neither the space not the need for the Bakerloo to return there.

According to one of the cunning plans circulated a couple of years ago
it wouldn't have got past Wembley Central because the DC line would
have been taken over by CrossRail.


The only cunning plan for Crossrail that I've heard of on that route was
for it to share the slow line to Tring, not take over the DC line. Everyone
has known, seemingly forever, that the Met would be going to the Junction,
and now it finally is, so what would Crossrail do at Watford? And how
would Crossrail get to Wembley, if not on the slow line? Why would it then
switch to the DC line?