On 2016\02\16 10:03, d wrote:
On Tue, 16 Feb 2016 09:49:06 +0000
Water musician wrote:
On 16 Feb 2016,
d wrote
(in article ):
No, its closed because TfL don't believe in installing reversing points.
To close 3 miles of the line that could satisfactorily operated otherwise
just because of work at one station is pathetic.


Presumably you DO believe in paying a £6 (or might it be a tenner?)
single-zone fare to fund lots of enhancements.


So lets get this straight, you think installing one extra set of reversing
points when the ELLX was being built would require an extra 5 quid on fares
to fund it do you?

Go and have a lie down.


Even a few yards of dual electrification require expensive and bulky
equipment.