View Single Post
  #4   Report Post  
Old September 2nd 16, 08:42 PM posted to uk.transport.london
[email protected] rosenstiel@cix.compulink.co.uk is offline
external usenet poster
 
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Default New North-South Cycle Superhighway

In article ,
(Richard J.) wrote:

wrote on 02 Sep 2016 at 17:45 ...
In article


rg,
(Recliner) wrote:


http://www.standard.co.uk/news/trans...outh-cycle-sup
erhighway-linking-kings-cross-and-elephant-and-castle-a3334166.html

Frustratingly, there is a plan of the scheme in the article but it's
unreadable. It's attributed to TfL. Doesn't anyone have a link to the
original, hopefully readable version?


That map is in the HTML document at
https://consultations.tfl.gov.uk/cyc...le-north-south
and is also in PDF format at

https://consultations.tfl.gov.uk/cyc...s/north-south-
cycle-superhighway-route-between-stonecutter-street-and-king---s-cross.pdf

Yes, that last link really does end in king---s-cross.pdf !


Thanks. So this joins up at Stonecutter Street with CS6 under construction.
That has a two way cycleway on the west side of Farringdon Street while this
extension from there to St Pancras has with-flow cycleways both sides of
Farringdon Street. How do they join up? No indications of junction works,
signals etc.

--
Colin Rosenstiel