View Single Post
  #2   Report Post  
Old September 20th 16, 10:07 PM posted to uk.transport.london,uk.railway
Recliner[_3_] Recliner[_3_] is offline
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default Thameslink / Southeastern timetable consultation

Basil Jet wrote:

They've figured out that all this new track they've been planning since
the 1980s and have almost finished building won't actually work.

http://www.southernrailway.com/your-...-consultation/

Discussion at
http://www.londonreconnections.com/2...via-greenwich/


Well, they've realised that the currently planned high frequency timetable
is slightly too ambitious, not that the new track won't work.