Opening tomorrow (Saturday).

The re-building was due to take 18 months. I don''t know if that is how long it has actually taken, because I can't remember when it closed.

Why did it take so long to re-build such a small structure? There seemed to be a long gap between the demolition of the old station and the construction of the new one, but a long closure was planned.
Is it a TfL project? If it is, there's your answer.