View Single Post
  #3   Report Post  
Old May 29th 04, 10:07 PM posted to uk.transport.london
Jaime Jaime is offline
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 17
Default Scope for Changing LU Route Linkings

snip
I believe LU are considering changing the sub-surface lines. Trains would

go
Hammersmith - Edgware Road - Liverpool Street - South Kensington - Edgware
Road where it would reverse and head back the other way. This would have

the
advantage of giving Circle trains somewhere to make up any time they have
lost.


With the District Line covering the rest of the Hammersmith and City would
this mean the end of either the Hamersmith and City or the Circle line. i.e.
is whats proposed a merging of the 2 lines?