On Thu, 10 Aug 2017 08:29:26 +0000 (UTC), d wrote:

On Wed, 09 Aug 2017 18:13:20 +0100
e27002 aurora wrote:
On Wed, 9 Aug 2017 15:10:45 +0000 (UTC),
d wrote:
The eurostar terminal could have been used pretty much as was. All they'd
have had to install would be gates and departure boards downstairs in the
former eurostar concourse and the track was already linked to the rest of the
network.

The platforms were the wrong height. Moreover, the track layout and


I'll have to go back and see if they've raised them. It didn't look as though
they had when I went there on tuesday and lowering the track is obviously
not feasible.

signalling may not have been appropriate for domestic traffic.


Sure, they'd have had to install some points and redo signalling interlocking
but how long would that take at worst, 6 months?

But, you are correct, in that after the international service moved to
Saint Pancras, DfT and Network Rail should have been considering
re-utilizing the station.


Given the recent new rail projects given the go ahead one can only hope the
view of rail being a liability that seems to have been prevelant in the DfT
for years is slowly going by the wayside.

Quite the contrary, Networks Rail's terrible job of costing the
electrification projects has caused the D(a)ft to become very wary of
rail investment. One fears lean times lie ahead.