On Wed, 22 Nov 2017 09:02:59 -0600
wrote:
In article ,
() wrote:

On Wed, 22 Nov 2017 13:23:23 +0000
Recliner wrote:
On Wed, 22 Nov 2017 07:02:48 -0600,

wrote:

In article ,
(Someone
Somewhere) wrote:

On 22/11/2017 12:20, David Cantrell wrote:
On Tue, Nov 21, 2017 at 03:55:28PM +0000,
wrote:
The latest london special issue of modern railways suggests that
the met line has finally been linked up with the remains of the
widened lines at moorgate via a spur at farringdon.

Seems odd. Why on earth would they bother?

Presumably to reduce the pressure on Aldgate and the flat junction
between Liverpool Street and Aldgate East. If you ever catch an H&C
train through there there's probably an 80% chance it will end up
stalled waiting for a Met line.

I though it was just for extra siding space at Farringdon?

I believe that's correct. The sidings will be long enough for S8
trains, though normally only S7s will be stabled there.


Yup, the article said stabling. Though I imagine they could use it as an
emergency termination point if the part between farringdon and moorgate
stuffs up. I wonder if it would need to be re-certified to carry
passengers or whether it'll inherit those as grandfather rights?


I don't think the sidings will stretch as far as the platforms at Barbican,
let alone all the way to Moorgate.


The track's already there, it would cost relatively little to put down some
power rails and I can't imagine them wanting to store the trains in some
leaky tunnel with the driver having to walk out of it.