In article ,
(Offramp) wrote:
On Thursday, 23 November 2017 09:42:08 UTC, David Walters wrote:
Promise of 24 Thameslink trains running through central London each
hour will not be fulfilled until another £900m of work is carried
out
https://www.theguardian.com/uk-news/...-completion-de
layed-london-december-2019
I live near Mitcham Eastfields, which is on Thameslink. There is a
level crossing associated with the station. Sometimes three trains
are scheduled to go through the station, let's say, NB, SB and a
fast. This can mean that the barriers stay down for 7-10 minutes. By
that time pedestrians and drivers are starting to get cranky.
If the barriers stayed down for much longer I think people would
start edging forward.
I'm amazed people don't realise how long level crossings can stay down. When
I was a kid in the 1960s we knew that. My parents always turned the car
engine off to wait at one as most motorists did. People can be so impatient
these days.
--
Colin Rosenstiel