Widened lines moorgate spur
On Sun, 26 Nov 2017 10:19:24 +0000
"Clive D.W. Feather" wrote:
a double junction at the east end of Farringdon. The line will run as
double track to Moorgate and will not be for passenger service, only for
I wonder why not. You'd think it would be a useful divert if the farringdon to
moorgate section stuffs up. Does the circle line have ATO installed yet?
Perhaps they don't want the cost of installing it on this branch and trains
will simply be driven manually with conventional signalling.
|