View Single Post
  #32   Report Post  
Old March 12th 18, 12:28 PM posted to uk.railway,uk.transport.london
Anna Noyd-Dryver Anna Noyd-Dryver is offline
external usenet poster
 
First recorded activity at LondonBanter: Jan 2015
Posts: 355
Default Mail Rail (Post Office Railway) visit

Roland Perry wrote:
In message
-sept
ember.org, at 09:29:30 on Mon, 12 Mar 2018, Recliner
remarked:
Roland Perry wrote:
In message , at 16:44:49 on Sun, 11 Mar
2018, Anna Noyd-Dryver remarked:
- They told me that the rest of the railway is still owned and
maintained by the Royal Mail. There is at least the theoretical
possibility of the museum trains doing a longer circuit, perhaps to
the next station, but there appear to be no current plans for such an
expansion. It would obviously need Royal Mail's agreement, and there
would be a significant costs. The current trains may not have the
battery capacity for the extra distances involved.

Problems include lack of emergency exits.

From the site's FAQ:

"Evacuation requirements mean that access to the Mail Rail train ride is
restricted to those who are able to walk unaided on uneven terrain, in a
confined space for up to 100m before climbing 70 steps to the surface."


If the ride was extended to loop round the next station,


Just so you know, I'm not advocating an extension.


But that's what was being discussed in the post you replied to.

there would need to be an evacuation route through that station.


Every station will have some kind of access to ground level.


They used to have, obviously, but I believe that most are now blocked off.


Anna Noyd-Dryver