View Single Post
  #38   Report Post  
Old March 12th 18, 03:51 PM posted to uk.railway,uk.transport.london
Anna Noyd-Dryver Anna Noyd-Dryver is offline
external usenet poster
 
First recorded activity at LondonBanter: Jan 2015
Posts: 355
Default Mail Rail (Post Office Railway) visit

wrote:
On Mon, 12 Mar 2018 13:28:34 -0000 (UTC)
Anna Noyd-Dryver wrote:
wrote:
On Mon, 12 Mar 2018 11:04:07 +0000
Roland Perry wrote:
In message 2132316179.542480534.571005.recliner.ng-
, at 17:05:04 on Sun, 11 Mar
2018, Recliner remarked:
Additionally the conductor rail has to be removed to allow the passenger
train to run; this is not a problem in itself but it does prevent future
demonstrations of automatic trains (something I'd love to see, but I don't
know if it's on anyone's agenda) if you remove too much of it.

I didn't know the line had been used for trials of automatic trains? How
would they get them up and down, given that the old depot can no longer be
used for surface access?

Here's how they took out some of the remaining trains in 2011:

https://www.londonreconnections.com/...ving-the-mail-
rail/

Some quite thin chains given how heavy those locomotives must be.



Surely the single yellow fabric strap is the more concerning part of the
set up?


Depending on what they're made of fabric straps can be exceptionally strong.
Plus I doubt that carraige is as heavy as the locos.



There are four yellow straps lifting the carriage. There's just one lifting
the power units.


Anna Noyd-Dryver