View Single Post
  #13   Report Post  
Old May 20th 18, 10:52 AM posted to uk.railway,uk.transport.london
Roland Perry Roland Perry is offline
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Goblin electric trains delayed by three months

In message
-sept
ember.org, at 10:39:12 on Sun, 20 May 2018, Recliner
remarked:
ISTR that they are committed to the West Midlands franchise.
(Makes sense, they are the other major 172 operator, although I'm
surprised that Chiltern don't want them.)


Fellow Arriva TOC Chiltern probably would like to have them, but stock
allocation is a DfT decision.

At least 1 unit is earmarked for the Coventry-Kenilworth-Leamington
service from December.

I'm assuming that they might need some works attention before that, if
only to have a toilet fitted.


That would be quite expensive, and a large disabled loo will take out a
significant proportion of the seats in a two-car set.


Doesn't appear to worry TOCs running with 2-car 170's plus disabled
tiolet in their fleet.

https://www.crosscountrytrains.co.uk..._seat_plan.pdf
--
Roland Perry