View Single Post
  #7   Report Post  
Old May 21st 18, 03:52 PM posted to uk.transport.london
Roland Perry Roland Perry is offline
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Whats going on at Moorgate?

In message
-septe
mber.org, at 15:00:43 on Mon, 21 May 2018, Recliner
remarked:
I was on the Met line platforms at moorgate for the first time in about 5
years today. The entire old Thameslink platform has been partitioned off. Is
this to do with crossrail or is something else going on in there?

Turning the old CWL into LU sidings.

Is it nothing to do with the new trains that are due in September? I have no idea!


They use a completely different set of (subterranean) platforms.


Indeed so. The Elizabeth line Moorgate and Liverpool St station entrances
share one pair of much longer, deeper platforms to the southeast of the old
CWL Moorgate platforms:
https://goo.gl/images/5gg9sV


Are trains for those due in September too?
--
Roland Perry