View Single Post
  #4   Report Post  
Old March 19th 21, 10:51 AM posted to uk.transport.london
Roland Perry Roland Perry is offline
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Hammersmith Bridge could re-open next summer

In message , at 11:38:43 on Fri, 19 Mar
2021, Graeme Wall remarked:
On 19/03/2021 10:19, Roland Perry wrote:
In message , at 09:37:19 on Fri, 19 Mar
2021, D A Stocks remarked:


https://www.ianvisits.co.uk/blog/202...-bridge-could-
re-open-next-summer/

"While the double-decker insert is in place, elements of
the
bridge that need repair, including the decking, would be lifted
away using the temporary bridge as a works platform and
transported by barges to an off-site facility for safe repair
and restoration."
Doesn't say if other river traffic would be allowed to resume at the
same time as cars.
See also: https://www.bbc.co.uk/news/uk-england-london-55086118


Presumably not till the dodgy bits have been removed for restoration.
How much river traffic would there normally be that far upriver?


A significant number of pleasure craft (some of whom have been stranded
away from their regular moorings), as well as the boat race (and
practising for it).
--
Roland Perry