View Single Post
  #172   Report Post  
Old April 14th 21, 08:23 PM posted to uk.railway,uk.transport.london
James Heaton[_4_] James Heaton[_4_] is offline
external usenet poster
 
First recorded activity at LondonBanter: Feb 2014
Posts: 52
Default LO lines to be named


"Anna Noyd-Dryver" wrote in message
...
MB wrote:
On 11/04/2021 11:56, Anna Noyd-Dryver wrote:
Hummer have already built 2 large battery SUVs. And H2 trains makes no
bloody sense whatsoever - just electric the damn lines and if its too
expensive for overhead then they should recind that moronic rule about
no more 3rd rail and lay that instead.


Health and Safety at Work Act, isn't it?


I would not have expected the H&S at Work Act to go into detail like
that.


About having exposed electro conductors at floor level?

Apparently it's something specific in electrical regulations too.

Either way, the point is that it's about staff safety not about
trespassers, as often claimed.


Electricity at Work Regulations 1989

It is mainly focused on staff safety.

Realistically the only way we're ever going to get more 3rd rail, is with
fully protected contact like the DLR - which is incompatible with existing
installations on the southern/mersey.

James