Kelly Lee wrote:
The Transport for London business plan for 2005 - 2012 includes "Schemes to
relieve traffic congestion and improve the local environment at Coulsden,
Bounds Green and Thames Road, Bexley"
I think this may be the minor improvemets planned and not the D3 grade
separated route.
There are details of the minor improvements at
http://www.londontransport.co.uk/str...20Bounds%20Gre
en.pdf
It was decided that the grade-separated route was too expensive, at a
cost of £900m for all the improvements (Henleys Corner, Bounds Green,
Green Lanes). So instead TfL are progressing a smaller £24m set of
improvements and they'll see how it goes.
--
Dave Arquati
Imperial College, SW7
www.alwaystouchout.com - Transport projects in London