Paul Terry wrote in message ...
In message , Bored Of The
Rings writes
Whatever happened to the extension south of E&C?
The 1949 plan shown on the map was abandoned because of cost (before the
war a similar plan had been curtailed to just a 515-foot siding beyond
Elephant).
and where was it gonna be extended to?
In that particular incarnation, Camberwell (Green). For more detail, see
the History section of:
http://www.davros.org/rail/culg/bakerloo.html
Later, as
http://www.addington3.freeserve.co.uk/tranmon3.html
explains, the JLE proposal was originally a BLE proposal.