View Single Post
  #6   Report Post  
Old November 30th 04, 11:42 AM posted to uk.transport.london,uk.railway
Aidan Stanger Aidan Stanger is offline
external usenet poster
 
First recorded activity at LondonBanter: Jan 2004
Posts: 263
Default What would a Gatwick to Liverpool Street service require?

Clive D. W. Feather wrote:
writes


Restoration of the Shoreditch - Liverpool Street connection, providing
platform capacity at Liverpool Street (Crossrail could do that),


Neither the connection nor the platform capacity is the issue. The
problem with Liverpool Street is that the 6 approach tracks are at
capacity in the peaks.


OK, the approach capacity not the platform capacity. Crossrail could
still solve it.

As for the connection, it could be a problem depending on how they
construct the ELL-NLL link.