Loading gauge
In article ,
Tom Anderson writes
I can't think of anywhere that C stock isn't allowed to go. There's a
limit of 4 cars when in service on the ELL, but that's all.
"[...] 6-car C-Stock. These certainly have clearance issues in the
Dagenham area (meaning no through routing Hammersmith Met - Upminster),
and may have on the Richmond/Ealing branches."
[...]
there used to be some sort of problem at Dagenham East, which meant the
trains had to go through the station slowly or something,
I think that was a purely temporary issue.
My understanding is that the new stock will be built to C/D loading
gauge, running in different lengths: 4 cars for the ELL, 6 cars for
Circle, H&C, and Wimbleware services, 7 cars for the District via Tower
Hill, and 8 cars for the Metropolitan.
Okay. I assume it's not possible (or at least easy) to add and remove cars
to a train;
I suspect that there'll be cab cars and non-cab cars (the trains are
supposed to be walk-through), and cutting a formation to add or remove
the latter will be relatively easy. There'd be no great need in normal
service, though.
--
Clive D.W. Feather | Home:
Tel: +44 20 8495 6138 (work) | Web: http://www.davros.org
Fax: +44 870 051 9937 | Work:
Please reply to the Reply-To address, which is:
|