Wapping
Dave Arquati wrote:
As for Wapping, the expense of extending the platforms could
jeopardise the whole of Phase 2; I wonder whether TfL would
rather try to negotiate with the HMRI or whoever to allow long
trains to serve the short platforms there ("For Wapping, use
front 4 cars only").
If common sense prevails, perhaps there will be an electronic door
control system that allows a driver to flip switches to selectively
isolate doors on individual units. This would allow _any_ four cars of
a train to be used at Wapping.
How much would it actually cost to extend the platforms by four cars
and additionally widen them if the H&S mafia decree it?
|